Increasing capacity to manage larger flows for AMP8 & WINEP
Protect watercourses from untreated sewer discharges from storm flows and storm tanks with reliable powered or non-powered screening.
Where additional storm tanks are added to increase stormwater storage at a WwTW, including screening at the inlet will ensure that there is no build-up of solids in the tank that could reduce the capacity. This will reduce the maintenance and clean out commitment. When the tank capacity is exceeded during storm events, only pre-screened flows will be discharged to the watercourse.
Our solutions
We can provide WwTW operators with reliable 6 mm in two direction screening with a powered Heliscreen® or with a simple non-powered Hydro-Static® Screen.
Find out more about the Hydro-Static® Screen
Find out more about the Heliscreen®
Engineers can also screen flows that bypass direct to the watercourse with an MNSS Screen
Find out more about the MNSS Combined Screen
Talk to an expert about an AMP8 or WINEP project
Talk to our experts and find out more about how we can help you with your AMP8 or WINEP projects.
Download the brochure
Download our brochure to find out more about how our products and services can provide solutions to AMP8 and WINEP.
